top of page

Power System Equipment Application

​Power Transformer Auxiliary Control & Cooling

Equipment Integration Location

Transformer auxiliary cabinets, cooling control boxes and local control cabinets.

Modular control, monitoring and auxiliary-protection components for transformer auxiliary and cooling systems.

Engineering Task Chain

Follow the control and monitoring task chain.

Functional Modules

Review capability by engineering task.

01

Auxiliary Power Supervision

Supervises supply availability, phase sequence, phase loss and voltage conditions.

  • Digital phase / voltage supervision relays - exact series by model matrix

02

Temperature Monitoring

Acquires winding, oil or local temperature for isolation, threshold decisions or signal transmission.

  • Digital temperature relays

  • STT temperature transmitters - sensor and channel count by project

03

Cooling Fan Staging & Control

Creates fan start and stop commands using temperature thresholds, timing and grouped control logic.

  • Temperature relays

  • Timing relays

  • Auxiliary relays

04

Alarm & Remote Signalling

Collects temperature, supply and fan faults for local display, alarm contacts and remote status.

  • SAD / SFA

  • PCR isolationPCR isolation

  • Auxiliary relays

Applicable product and technology directions

Product Directions

Phase and voltage supervision

Temperature and current relays

STT

Timing and auxiliary relays

SAD / SFA

PCR

TH-E / TH-B

Application Boundary

Engineering scope

  • Not presented as a complete transformer cooling-control cabinet.

  • Main-circuit motor protection and transformer main protection remain outside this scope.

RFQ & Engineering Support

Share the application conditions.

A complete engineering drawing is not required. A model, BOM, RFQ or non-sensitive technical information is sufficient to start.

  • Transformer and cabinet type

  • Auxiliary supply

  • Temperature sensors and channels

  • Fan groups and control logic

  • Current and feedback signals

  • Alarm and communication

  • Environment and standards

01

Auxiliary-power status

06

Alarm and remote signalling

02

Phase and voltage condition

07

Cabinet environment

03

Temperature start condition

04

Fan staging and timing

05

Current and running feedback

WhatsApp

Contact Us

​​​​​​​​​​​​Office :13th Floor, Building A, Xincheng Headquarters Tower, No. 13 Pukou Avenue, Pukou District, Nanjing, Jiangsu Province, China​​​​​​​​​​​​​​​​

​

​Factory: No. 34 Zifeng Road, Pokou District, Nanjing City, Jiangsu Province

Quick Link

bottom of page