top of page


Making Protection Testing Safer and More Efficient
During protection testing and calibration, engineers frequently operate CT, PT, control power, and trip circuits —each a potential...

TonyZhang
Oct 83 min read


ODES PT Bus Voltage Transfer Relays in Overseas Projects
Dual-bus substations are common in transmission and renewable integration projects, but managing PT voltage transfer through discrete...

TonyZhang
Oct 82 min read


ODES Power Supply Monitoring Relays in Overseas Projects
In modern substations and industrial facilities, auxiliary power quality directly determines the reliability of protection,...

TonyZhang
Oct 82 min read


Trip Circuit Supervision Relays in Overseas Projects
In every protection system, trip circuit integrity is a critical acceptance and maintenance checkpoint. A circuit that fails between...

TonyZhang
Oct 82 min read


ODES Fast Trip Relays in Overseas Projects
In many overseas substations, protection schemes demand very fast breaker operation . When distance, differential, or busbar protection...

TonyZhang
Oct 42 min read


ODES Lockout Relays in Overseas Projects
In protection systems, the quality of trip blocking and reset determines the safety boundary after a fault and defines the discipline...

TonyZhang
Oct 42 min read


Next-Generation PT Dual-Bus Voltage Transfer Relay
In dual-bus substations, the PT voltage transfer circuit is fundamental to stable switching for measurement, protection, and...

TonyZhang
Oct 42 min read


Flashing Disconnector LEDs in MSCR662A – Troubleshooting Guide
In 3/2 busbar schemes, where three breakers are connected in series, synchronizing voltage selection and transfer must be precise....

TonyZhang
Oct 42 min read


Dead-Bus Closing with Synchro-Check Relays: Application Guide
In manual synchronization, synchronizing check is the default method: close only when the voltage, frequency, and phase‑angle...

TonyZhang
Oct 42 min read


ODES Motor Phase‑Sequence Relay Application Guide
Three‑phase motors are exposed to two high‑impact risks during maintenance and temporary hookups: incorrect phase sequence (reverse...

TonyZhang
Oct 42 min read


Preventing Reverse Rotation and Burnout: Practical Insights on Motor Phase‑Sequence Relays
Three‑phase motors are vulnerable to two high‑impact events: incorrect phase sequence (reverse rotation) and phase loss ...

TonyZhang
Oct 42 min read


Input–Output Logic of ODES WY-35A4 Three-Phase Voltage Supervision Relay
In engineering practice, different systems may require different alarm and reset logics for three-phase undervoltage supervision...

TonyZhang
Sep 272 min read


Wiring Guide: ODES WY-31A4 Three-Phase Voltage Supervision Relay
In secondary circuits, proper wiring of three-phase voltage supervision relays is critical to ensure accurate monitoring and reliable...

TonyZhang
Sep 272 min read


Reliable Synchronizing Voltage Selection for Secure Grid Connection
In power-system interconnection, accurate synchronizing voltage selection is essential for secure and reliable operation. This...

TonyZhang
Sep 272 min read


Standards and Key Requirements in Secondary Circuit Design
In global power projects, IEC international standards , GB/T national standards , and DL/T industry standards are the...

TonyZhang
Sep 252 min read


ODES Multi-Unit Manual Synchronizing Device: Evolving for Hydropower
Synchronizing Multiple Generating Units In hydropower plants and other multi-generator sites, several units often need to connect to the...

TonyZhang
Sep 232 min read


ODES Manual Synchronizing Device: One Panel, Complete Control
Complexity in Conventional Manual Synchronizing In field synchronizing operations, operators are required not only to monitor voltmeters,...

TonyZhang
Sep 222 min read


ODES Integrated Digital Synchronoscope: Three-in-One Efficiency
In traditional synchronizing schemes, operators relied on five instruments—two voltmeters, two frequency meters, and one synchronoscope....

TonyZhang
Sep 221 min read


ODES Digital Synchronoscope: Precision and Reliability
Customer Demand: Simpler, Clearer Indication Operators asked a simple question: Can one device display both sides’ voltage? Can one...

TonyZhang
Sep 171 min read


ODES Manual Synchronizing Devices: From Five Meters to One Screen
Traditional Manual Synchronizing: The Five-Meter Burden In conventional interconnection scenarios, operators relied on five separate...

TonyZhang
Sep 152 min read
bottom of page