top of page


The Future of HV Switchgear Control — How the ODES PSME100 Platform Standardizes Disconnector, Breaker, and Energy-Storage Logic
High-voltage primary equipment keeps getting more diverse — split-phase breakers, multi-format energy-storage motors, inconsistent limit-switch schemes, interlocks spread across relays, and control cabinets filled with custom wiring. Yet utilities increasingly demand the opposite: standardized, modular, repeatable control logic that is easy to maintain, quick to replace, and consistent across brands. The ODES PSME100 platform delivers exactly that — a family of plug-a

TonyZhang
Nov 30, 20254 min read


Fewer Wires, Smarter Alarms
Complex wiring doesn’t have to be the price of functionality. Discover how ODES is making GIS alarm systems lighter and smarter at www.odes-electric.com The Problem: Cable Clutter in Modern GIS Panels In many GIS high-voltage switchgear projects, door-control wiring —the bundles of signal cables running from the cabinet body to the front door—remains a persistent challenge. It’s common to see 30 or more wires , each several meters long, running through the door frame li

TonyZhang
Nov 11, 20253 min read


ODES TSB-14 Testblock Configuration Made Simple
In overseas projects, Testblocks are essential for safe and standardized protection testing. Engineers often ask the same question:...

TonyZhang
Oct 9, 20253 min read


Making Protection Testing Safer and More Efficient
During protection testing and calibration, engineers frequently operate CT, PT, control power, and trip circuits —each a potential...

TonyZhang
Oct 8, 20253 min read
bottom of page
